We carried out the installation of 27 kilometres of electric fencing in the Reserva Especial do Niassa in 2025, a project that was fully executed by our team.
The intervention included route surveying and marking, corridor clearing and preparation, supply and installation of posts, conductive wires and insulators, as well as the assembly of the energizing system with solar panels, batteries, and energizers. Technical testing, voltage calibration, and final inspection were also conducted to ensure the full functionality of the infrastructure.
This work was executed with high technical rigor and strong environmental commitment, contributing to wildlife protection, the reduction of human–wildlife conflicts, and the strengthening of conservation efforts in the region.
GALLERY





